Skip to content
333 Construction Group

Concrete · year-round

Selective demolition

Before the build, somebody has to take the old thing down. We do it cleanly: protect what stays, separate the recyclables, leave a buildable site.

What we do differently

Built to last, not to ship.

The cheap version of this work isn't really cheap — it's deferred. Here's what we don't cut.

  • 01

    Sheds, garages, decks, fences

  • 02

    Pool removal & fill

  • 03

    Interior demo for renovations

  • 04

    Asbestos screening on pre-1990 builds

  • 05

    Permits handled where required

How a job runs

From first call to clean exit.

Every project follows the same arc. The detail changes, the discipline doesn't.

  1. 01

    Site walk

    Confirm what stays, what goes.

  2. 02

    Permits

    Township demolition permit pulled if needed.

  3. 03

    Disconnect

    Utilities locked out & capped.

  4. 04

    Demo

    Down piece by piece — sort metal, wood, drywall.

  5. 05

    Haul & clean

    Bin out, site swept.

FAQ

Common questions

  • Yes. We can full-remove (concrete walls broken up and hauled, hole filled with engineered fill) or partial (cut walls below grade, fill in place). Most townships now require engineered compaction certificates.

  • Yes. Kitchens, bathrooms, basements, plaster walls. We protect floors, isolate dust with poly, and bin direct.

Free quotes

Ready for demolition?

Send us a couple lines about the project — square footage, photos, your address. We'll reply within a business day.